ZigaForm version 7.6.9

908-232-6600

Expertly Crafted Wood Floors in NYC — Herringbone, Chevron, Wide Plank & Refinishing by Certified Specialists

How long after I order my floors will it take before they are installed?

,

That depends. Site-finished floors will take longer to install than factory-finished floors since the finish needs to be applied, and dry, on site.

Depending on the type of finish used, you can expect that there will be multiple coats applied, and that each coat will need to be sanded before the next coat is applied, and also will need to dry thoroughly before the floor can be walked on. In addition, all wood flooring, whether job-site finished or factory-finished, will need to be delivered to the job site and allowed to acclimate for a period of time before the installation can begin. This can take several days depending on the material being used.

This is a very important part of the installation process because the wood must reach equilibrium moisture content (EMC) with the job site conditions to ensure a long-lasting, high-quality installation.

By NWFA

Leave a Reply

Contact info

contact@example.com

123-456-7890

123 Startup Lane, Floor 3 Unit C, Profit, MA

Discover more from NYC Wood Floors | Herringbone, Chevron & Wide Plank | Refinishing

Subscribe now to keep reading and get access to the full archive.

Continue reading